Our work

Real jobs. Real outcomes. Right across Kent.

A selection of recent rewires, extensions, refits and commercial installations, what we found on site, what we did about it, and what changed for the customer.

Discuss your project 07864 901019

Recent projects

Before, after, and exactly what changed.

No stock photos, no fluff. Every project below was completed by the Spectrum team for a real Kent customer.

Electrician·6 working days

Full house rewire, 1930s semi, Tunbridge Wells

Before

Original cloth-insulated wiring, no RCD protection, fuse board tripping under modest load. Two bedrooms unusable after dark.

After

Complete rewire over 6 days. New 18th Edition consumer unit, additional sockets through every room, USB outlets in bedrooms, dimmable LED zones downstairs. Full EIC issued, all chases made good.

Builder·9 weeks

Single-storey rear extension, Tonbridge

Before

Cramped kitchen-diner, no garden access, dated 1980s lean-to leaking at the flashing.

After

Demolition, new footings, cavity walls, flat roof with lantern, full electrics and plumbing first fix, plastered ready for kitchen install. Project-managed end to end in 9 weeks.

Tiling·11 working days

Bathroom refit, period cottage, Brenchley

Before

Awkward sloped ceiling, original lath-and-plaster, tired suite with active leak under the bath.

After

Strip out, board out, full porcelain tiling floor and walls, new suite with concealed cistern, downlights and extractor. Watertight finish, no compromise on the period proportions.

Electrician·5 working days

Landlord EICR remedials, 3 properties, Sevenoaks

Before

Three rental properties with C2/C3 codes blocking new tenancies. Different fuse boards, different problems on each.

After

All remedials completed within a week, fresh EICRs issued and consumer units upgraded where required. Letting agent moved tenants in on schedule.

Carpenter·8 weeks

Loft conversion, Mayfield

Before

Unused loft, narrow access, owner needed a third bedroom with ensuite without extending the footprint.

After

New staircase, structural floor, dormer, full first-fix carpentry, ensuite plumbed and tiled, lighting designed with the homeowner. Building Control signed off first visit.

Landscaping·12 working days

Patio, fencing & garden lighting, Langton Green

Before

Worn slabs, rotten fence panels, no outdoor sockets or lighting beyond the back door.

After

Levelled and laid 42 m² of porcelain paving, replaced 18 m of fencing, installed weatherproof outdoor sockets and zoned IP65 garden lighting on its own circuit.

Builder·3 weeks (nights & weekends)

Commercial fit-out, consulting rooms, Tunbridge Wells

Before

Open-plan office needing partitioning into 4 sound-treated consulting rooms with separate data, lighting and power on each.

After

Studwork partitions, acoustic insulation, suspended ceiling tiles, dedicated lighting circuits, Cat6 cabling and dimmer control per room. Delivered out-of-hours with zero trading downtime.

Roofer·2 working days

Roof repair & gutter replacement, Paddock Wood

Before

Storm-damaged flashing and a sagging gutter run causing water tracking down the rendered front elevation.

After

Stripped and re-leaded the lead flashing, replaced 14 m of guttering and downpipes, repointed flashing detail. Render cleaned and sealed. No further water ingress.

Got a project like one of these?

Send us the scope or a couple of photos and a postcode. We'll come back with a fixed written quote and a realistic timeline, free of charge, usually within 48 hours.

Start a quote 07864 901019